PROJECT:
STERLING POINT STORM WATER PUMP STATION
Construction of a fourteen-foot (14’) diameter concrete wet well and 8’x20’ concrete discharge trough, well point system and dewatering as necessary; two (2) mixed flow pumps with accessories; piping; valves; fittings and supports; protective coatings; site work; concrete panel fencing with swing gate; concrete pavement; on-site storm sewer piping including well point system and dewatering as necessary; storm junction box and manholes; natural gas engine driven generator; automatic transfer switch and load bank testing; pump station control panel; electrical service; disconnect switches; conduit; wire; and all else necessary for a fully functioning pump station.
Project Overview
OWNER:
Harris County Municipal Utility District No. 213A
ENGINEER:
Quiddity
notice to proceed:
09/30/2022
Project Completed:
01/22/2024
CONTRACT AMOUNT:
$1,763,000.00