PROJECT:

STERLING POINT STORM WATER PUMP STATION

Construction of a fourteen-foot (14’) diameter concrete wet well and 8’x20’ concrete discharge trough, well point system and dewatering as necessary; two (2) mixed flow pumps with accessories; piping; valves; fittings and supports; protective coatings; site work; concrete panel fencing with swing gate; concrete pavement; on-site storm sewer piping including well point system and dewatering as necessary; storm junction box and manholes; natural gas engine driven generator; automatic transfer switch and load bank testing; pump station control panel; electrical service; disconnect switches; conduit; wire; and all else necessary for a fully functioning pump station.

Project Overview

OWNER:

Harris County Municipal Utility District No. 213A

ENGINEER:

Quiddity

notice to proceed:

09/30/2022

Project Completed:

01/22/2024

CONTRACT AMOUNT:

$1,763,000.00