PROJECT:

SUNTERRA LIFT STATION No. 1

Ten foot (10’) diameter cast-in-place concrete wet well, wet well vent and bollards; two (2) submersible pumps with guide rails, piping, fittings, valves, pipe supports, and pump lifting chains; on-site concrete access driveway; diesel generator, with sub-base fuel tank and slab; service rack and control panel with slab; eight foot (8’) brick fence with sliding/swing gate and pedestrian gate; water service line, backflow preventer and hose bibb; junction manhole and influent sewer lines; all electrical facilities including junction boxes, autodialer, floats, transducer, conduits and conductors; and all else necessary for a complete and functioning lift station.

Project Overview

OWNER:

Harris-Waller Counties Municipal Utility District

ENGINEER:

Quiddity

notice to proceed:

02/22/2022

PROJECT COMPLETED:

06/20/2023

CONTRACT AMOUNT:

$1,220,628.99