PROJECT:
SUNTERRA LIFT STATION No. 1
Ten foot (10’) diameter cast-in-place concrete wet well, wet well vent and bollards; two (2) submersible pumps with guide rails, piping, fittings, valves, pipe supports, and pump lifting chains; on-site concrete access driveway; diesel generator, with sub-base fuel tank and slab; service rack and control panel with slab; eight foot (8’) brick fence with sliding/swing gate and pedestrian gate; water service line, backflow preventer and hose bibb; junction manhole and influent sewer lines; all electrical facilities including junction boxes, autodialer, floats, transducer, conduits and conductors; and all else necessary for a complete and functioning lift station.
Project Overview
OWNER:
Harris-Waller Counties Municipal Utility District
ENGINEER:
Quiddity
notice to proceed:
02/22/2022
PROJECT COMPLETED:
06/20/2023
CONTRACT AMOUNT:
$1,220,628.99